Buxar.bih.nic.in
Background Information Required for Approval of District PIPs for 2013-14
FMR. B.16 Drugs:
Articulation of policy on entitlements, free drugs for delivery , rational prescriptions, timely procurement of drugs and consumables,
smooth distribution to facilities from DH to SC, uninterrupted availability to patients, minimization of out-of-pocket expenses, quality assurance, prescription audits, EDL in public domain, computerized drugs and logistics MIS system.
Essential drugs lists (EDL) is to be prepared by the State and budget should be projected accordingly.
Requirement of drugs for the FY 2013-14
Justification
S.No. Name of essential drugs
Quantity
Unit cost
5% Dextrose + 0.45% Sodium Chloride Inj. 500 ml
Acetylcysteine Inj. 200mg /ml – 2ml Amp.
Adhesive Tape 0.5”( 1 roll of 1.25cm X 5m)
Adhesive Tape 1.0”( 1 roll of 2.5cm X 5m)
Adhesive Tape 2.0”( 1 roll of 5.0cm X 5m)
Amoxycillin + Clavulanic Acid Inj 1 gm + 200mg
Amoxycillin + Cloxacillin 125 mg + 125 mg 5ml dry
Amoxycillin Dry Syrup 125mg/5ml – 60ml Bottle
Ampicillin + Cloxacillin Inj. 250mg+250mg
Ampicillin + Cloxacillin Inj. 500mg+500mg
Ampicillin 250mg & Cloxacillin 250mg Cap
Antitetanus Human Immunoglobin Inj. 250 . 750. 1000.
B.T. set with Needle Multi Dose vial (500mg/ ml) –
Co- Trimoxaxole Tab Trimethoprim I.P 80mg
Dextrose with Sodium Chloride Inj. 5% + 0.9%
Diclofenac Gel Ointment 1% w/w- 30gm Tube
Dicyclomine HCl + Paracetamol Tab 10/20mg +500mg
Digestive Enzyme Syrup 100ml Each 5ml Containing
atleast fungal Diastase (1:1200) 50mg & Pepsin 10mg
I.V Infusion Set with air way and Needle Adult
I.V. infusion Set with air way and Needle Child
Iron Sucrose 100ml bottle 100mg Elemental Iron
Urine Collecting Bag 2000ml Top side non return
Vaginal Tab. (Povione Iodine Vaginal Tab/ Pessaries
State needs to commit the amount for provision of essential drugs from State’s budget during the year.
FMR. B.16.1 Equipments:
Equipments procured and supplied to the health facilities should not be dumped and un-utilized. A facility wise gap analysis of equipments to done and projection to be made accordingly.
Name of the Facility- DH
No. of Normal
Name of the
existing
Delivery per
sections per
Occupancy
Justification
No. Equipment
proposed
equipment
equipment
Equipment
Above 100
Equipments
Equipments
Equipments
Name of the Facility- SDH
No. of Normal
Name of the
existing
Delivery per
sections per
Occupancy
Justification
No. Equipment
proposed
equipment
equipment
Equipment
Above 100
Equipments
Equipments
Equipments
Name of the Facility- PHC Chousa
No. of Normal
Name of the
existing
Delivery per
sections per
Occupancy
Justification
No. Equipment
proposed
equipment
equipment
Equipment
Above 100
Equipments
Equipments
Equipments
Name of the Facility- PHC Rajpur
No. of Normal
Name of the
existing
Delivery per
sections per
Occupancy
Justification
No. Equipment
proposed
equipment
equipment
Equipment
Above 100
Equipments
Equipments
Equipments
Name of the Facility- PHC Itarhi
No. of Normal
Name of the
existing
Delivery per
sections per
Occupancy
Justification
No. Equipment
proposed
equipment
equipment
Equipment
Above 100
Equipments
Equipments
Equipments
Name of the Facility- PHC Simri
No. of Normal
Name of the
existing
Delivery per
sections per
Occupancy
Justification
No. Equipment
proposed
equipment
equipment
Equipment
Above 100
Equipments
Equipments
Equipments
Name of the Facility- PHC Chougai
No. of Normal
Name of the
existing
Delivery per
sections per
Occupancy
Justification
No. Equipment
proposed
equipment
equipment
Equipment
Above 100
Equipments
Equipments
Equipments
Name of the Facility- PHC Nawanager
No. of Normal
Name of the
existing
Delivery per
sections per
Occupancy
Justification
No. Equipment
proposed
equipment
equipment
Equipment
Above 100
Equipments
Equipments
Equipments
Name of the Facility- PHC Brahmpur
No. of Normal
Name of the
existing
Delivery per
sections per
Occupancy
Justification
No. Equipment
proposed
equipment
equipment
Equipment
Above 100
Equipments
Equipments
Equipments
Infrastructure Maintenance:
Type of Institution
Category of Post
Unit Cost
Amount Proposed
Direction
Administration
Sub-Centres
Urban Family
Welfare Centres
(UFWCs)
Urban Revamping
Scheme (Health
Posts)
Basic Training for
ANM/LHVs
Type of Institution
Category of Post
Unit Cost
Amount Proposed
Maintenance and
strengthening of
Health and FW
Training Centres
(HFWTCs)
Senior Health Inspector (Communicable Diseases)
Type of Institution
Category of Post
Unit Cost
Amount Proposed
Basic Training for
MPWs ( Male)
Type of Institution
Category of Post
Unit Cost
Amount Proposed
At New Basic
Training School
Source: http://buxar.bih.nic.in/Dept/health/HELTH_DHAP/Anexures%20B%2016.pdf
SOGC TECHNICAL UPDATE SOGC TECHNICAL UPDATE The Use of Progesterone for Prevention of Preterm Birth represents an abstraction of the evidence rather than aThis technical update has been reviewed by the Maternal Fetalmethodological review. The level of evidence and quality ofMedicine Committee and approved by the Executive of the Societyrecommendations are described using the criteria
MICROBIOLOGY MI-P1 INTEGRITY OF JNK PATHWAY IS REQUIRED TO PROTECT AGAINST CYTOTOXICITY TRIGGERED BY Vibrio cholerae EL TOR HAEMOLYSIN Saka Héctor A, Andreoli V, Sola C and Bocco José L Dpto. de Bioq. Clínica, Fac. de Cs. Químicas, Univ. Nac. de Córdoba, CIBICI-CONICET. has@bioclin.fcq.unc.edu.ar MI-P2 Brucella abortus LUMAZINE SYNTHASE IS A NOVEL VIRULENCE FACTOR Marchesin
Copyright 2014 Pdf Medic Finder